HEN-109-18.02
Project involved the replacement of the SR 109 over the Maumee River. As part of the project, alignment alternatives were developed to realign SR 109 to eliminate the existing offset intersection. The intersection with SR 109 with CR 424 was designed to change SR 109 to the predominant movement and make CR 424 a stop condition. The proposed bridge will be a 12 span prestressed concrete I-beam structure and will have aesthetic enhancements including bicycle friendly railing. The project also involved design of guardrail to provide access to a future bikepath, drainage improvements, ROW plans, traffic control, and MOT. Extensive environmental coordination was completed as the Maumee River at this location is classified as a recreational river.
- Location: Henry County, Ohio
- Cost: $11,600,000
- Client: The Ohio Department of Transportation (ODOT) District 2
- Services:
- Markets: